PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3rd floor interior metal framing Facing South.jpg 4th floor interior metal framing Facing South-West.jpg Electrical split wire at for the 3rd floor motorized dampers Facing South.jpg Installed low roof curbs Facing East.jpg Installed roof curbs at the high roof Facing West.jpg Installing storm piping at the 3rd floor Facing North.jpg Storm piping at the 4th floor for the Low Roof Facing East.jpg Storm piping at the 4th floor for the Low Roof Facing West.jpg Welding metal clips at the 1st floor Facing East.jpg
Previous pageNext page Installed roof curbs at the high roof Facing West
Installed roof curbs at the high roof Facing West